Unloading the generator installation container

Unloading the generator installation container

  Get machine from port (For new machine)

  Crane and complete assembly for the machine

  Check and operate the machine.

  Unloading, lifting, moving (For old machines)

  •  0911.77.08.78 - 0907.526.268
  •  sales.247dichvu@gmail.com
  •  sales.247dichvu@gmail.com

Description

Unloading the generator installation container

  Get machine from port (For new machine)

  Crane and complete assembly for the machine

  Check and operate the machine.

  Unloading, lifting, moving (For old machines)

  Execute the whole system

  Working equipment includes: Turtle, Roller, Beam, etc.

  Check the aisles, the safety of the machinery and equipment before putting the transmitter in the correct position.

We are the leading unit in the relocation and installation of backup power systems, from the machine to the comprehensive delivery to the project when inactive.

Facebook comment

Facebook comment

Advisory 24/7

 stcvietnam@stc-vn.com
 sales.247dichvu@gmail.com
 0911.77.08.78 - 0907.526.268

News Products

News Post

Visitor Counter

Advertisement

Advertisement